RF & NPI Specialist Award-Winning Poet Ultra Runner

探索極限的
跨界鏈結者

Masa Hsin-Lung Tu 杜信龍

半導體的微米世界裡,我是擁有 20 餘年經驗的射頻工程與 NPI 專家,用數據與六標準差追尋完美的晶片良率;
台語文學的瀚海星空中,我是獲臺灣文學金典獎首獎的作家,用母語的字句雕琢土地的溫度與歷史;
極限越野與超馬的泥濘山路中,我是用雙腳完成了 85 場賽事的行者,在無盡的呼吸與心跳中體會生命的純粹。

杜信龍 Masa Tu

Principle Product Engineer @ NXP

Tainan, Taiwan masahltu0322@gmail.com linkedin.com/in/masatu19810322
#NPI #SixSigma #Lean #BlackBelt #台語小說家 #100K超馬
點擊翻面查看快速數據

極限數據總覽

20+ 工程資歷 (年)
25+ 專利發明 (件)
9 出版著作 (本)
85 完成賽事 (場)
金典獎台語創作首獎
100+ 次熱血捐血
EMT-1 救護技術員
點擊翻回正面

Semiconductor & RF Engineering & Data Science

Over 20 years of experience leading New Product Introduction (NPI), RF systems, and cross-functional execution in semiconductor and wireless communication industries. Specialized in 5G automotive radar chip validation, yield optimization using Six Sigma methodologies, and automated data engineering pipelines.

擁有 20 餘年跨國大廠研發與新產品導入 (NPI) 經驗,精通 5G 車用雷達、射頻晶片與測試開發,致力於應用 AI/ML 與巨量數據分析推動良率改善與製程優化。

20+ Years of Experience
(產業資歷)
25+ Patents Granted
(發明專利)
4+ IEEE Technical Papers
(學術論文第一作者)
10+ AI/ML Use Cases
(AI 數據分析專案)

Engineering | Lean Expert | Black Belt | Data Science

Combining engineering rigor with web development to build lightweight, local-first web applications that eliminate daily engineering bottlenecks in data analysis, verification, and project tracking.

將寫作的邏輯與工程師的嚴謹結合,為解決產線與 NPI 常見的低效操作,親自開發了多款高效網頁應用程式 (WebApps)。

Dynamic PRD & Gantt Generator
Frontend Dev / Project Management

Dynamic PRD & Gantt Generator v9.5

A standalone, single-file HTML WebApp designed to bridge the alignment gap between writing PRDs and plotting schedules. Enforces boundary constraints, triggers overrun alerts, and generates high-res PNGs, A4 PDFs, and copyable GFM markdown or ASCII Gantt charts for Notion/Obsidian.

為解決專案文件與時程脫節開發的單檔案 WebApp。具備 Planned vs. Actual 雙軌進度對比、超期紅色警報,可一鍵導出 Markdown/ASCII 甘特圖與 A4 PDF,並整合多專案多維疊加 Yearly 覆盤功能。

Structured Quality Management WebApp
Quality Engineering / Lean Six Sigma

Structured Quality Management WebApp

A local-first Quality Management WebApp designed for structured problem-solving and risk mitigation. Features a guided 8D wizard (D1–D8), cross-functional DRI registry, 3×5 Why horizontal flowchart, SVG-rendered Ishikawa fishbone diagram, AIAG-VDA FMEA risk assessment with Action Priority (AP) calculation, and a Kanban board with automated overdue alerts.

專為結構化問題解決與風險管理開發的單檔案 WebApp。整合 8D 異常客訴引導精靈 (D1–D8)、DRI 團隊職責登錄、3×5 Why 根因分析水平流程圖、動態 SVG 石川魚骨圖、符合 AIAG-VDA 最新標準的 FMEA 風險評估(自動計算行動優先級 AP),以及具備超期自動示警功能的 Kanban 行動看板。

Loan Investment Decision Simulator
Fintech / Financial Modeling

Loan Investment Decision Simulator

A standalone interactive Fintech WebApp designed for comparing loans, interest rates, and investment scenarios. It helps users visualize long-term cash flow, compound growth, and debt payoff timelines, bridging the gap between borrowing and investing decisions through interactive graphs and customizable financial parameters.

針對個人與家庭財務規劃開發的互動式金融決策模擬 WebApp。提供固定與變動利率對比、提前還貸與投資收益分析等功能,透過視覺化現金流、複利增長與債務償還曲線,將複雜的借貸與資產配置決策轉化為直觀的數據洞察。

Semiconductor STDF Sanity Checker
Data Engineering / Yield Analysis

Semiconductor STDF Sanity Checker

A unified verification platform that accelerates NPI development and variant migrations (e.g., CP1 to CP2). Implements optimized PKL gzip caching for sub-second parsing of millions of rows of STDF data, comparing yield limits side-by-side and providing interactive wafer maps and Cpkn health dashboards.

針對 NPI 導入與程式版本遷移(如 CP1/CP2 整合)開發的一鍵式自動驗證平台。整合 Gzip-PKL 緩存達到百萬行 STDF 數據毫秒級加載,提供 Cpkn 良率分析、Wafer Map 互動映射與 Pareto 異常分析。

ECID Anomaly Detection System
Machine Learning / Big Data

ECID Spatial Outlier Detection System

A spatial-aware ML anomaly detector targeting maverick dies and edge defects. Utilizes Polars lazy evaluation and Parquet storage for sub-second ECID querying of 1.6 billion points. Combines Univariate (3-Sigma), Bivariate Regression (6-Sigma), NNR (Nearest Neighbor Residual) with PCA and TensorFlow Autoencoders.

以 Python + ML 開發的先進晶片異常檢測系統。運用 Polars 與 Parquet 於毫秒內查詢與分析數十億點晶圓座標;結合 3-Sigma、雙變量回歸與空間鄰近殘差 (NNR) 演算法,配合 PCA 與 TensorFlow 自動編碼器,捕獲潛藏的 Maverick 晶粒。

Professional Experience

Nov 2018 - Present

Advanced Product Engineer | NXP Semiconductors

Leading NPI development and yield optimization for 5G Car Radar applications with MIMO support and 77G ADAS Radar processors. Perform Fab matrix lot analysis for ATMC/TSMC (SiGe 0.18μm / CMOS 28nm processes). Implemented Zero-Defect Screen methods and Big Data analysis using Exensio-Yield and Python. Increased yield by 15%, saving $300K through process tuning and reducing defect rate down to 3ppm. Managed dual-sourcing qualifications for global assembly and test sites.

負責 5G 車用雷達晶片與 77G ADAS 雷達處理器之 NPI 開發與良率提升。負責 ATMC/TSMC 晶圓廠良率分析,導入零缺陷 (Zero-Defect) 檢驗方法。運用六標準差改善良率達 15%,省下約 30 萬美元,並推動全球封測廠之二源認證。

Feb 2017 - Nov 2018

Advanced Product Engineer | NXP Semiconductors

Managed 5+ NPI runs in high-volume production for Smart Antenna transceivers, Low Noise Amplifiers (LNAs), and Voltage-Controlled Oscillators (VCOs) with WLCSP and HSOP packaging. Directed PCM-WT-FT data correlation and 6-Sigma low yield analysis to identify process bottlenecks and execute cost reduction strategies.

負責智慧天線收發器、LNA、VCO 等 5 個以上新產品導入 (NPI) 量產管理,熟稔 WLCSP 及 HSOP 封裝流程。透過 PCM-WT-FT 數據關聯分析進行六標準差低良率根因排除與降本優化。

Sep 2016 - Feb 2017

Advanced Product Engineer (Overseas Trainee) | NXP Nijmegen, Netherlands

Collaborated directly with fab process integrators and process engineers in Nijmegen to define process windows for QBIC4X technology. Conducted product sensitivity analysis, finalized correlations between Wafer Test (WT) and Final Test (FT), and executed Lean Value Stream Mapping to optimize resource allocation.

派駐荷蘭 Nijmegen 總部,與晶圓廠製程整合及工程團隊協作定義 QBIC4X 晶圓製程窗口,優化 WT-FT 關聯性,導入 LEAN 價值流圖方法大幅削減生產成本與資源消耗。

Nov 2012 - Sep 2016

Advanced Product Engineer | NXP Semiconductors

Engineered packaging and assembly verification for RF High-Power LDMOS Amplifiers (Over-Mold plastic package) and RF small-form-factor devices (LNA, VGA, VCO, and Mixers). Handled Level-2 quality complaints and compiled 8D root-cause investigation reports.

負責射頻高功率 LDMOS 放大器與 RF 元件 (LNA、VGA、VCO 和 Mixer) 之封裝與組裝驗證 (WLCSP, HSOP),並主導客戶二級客訴之失效分析與 8D 報告撰寫。

Oct 2011 - Apr 2012

RF Senior Engineer | MStar Semiconductor

In charge of Bluetooth transceiver system-level verification, customer failures debugging, and co-existence validation between Bluetooth and cellular radio bands.

負責藍牙晶片系統級測試、設計驗證、失效分析、以及藍牙與行動通訊頻段共存性問題排查。

Jan 2006 - Oct 2011

RF System Engineer | Foxconn (富士康)

Designed and verified indoor/outdoor CPEs and base station modules for WiMAX networks. Authored comprehensive technical proposals in response to RFQs, including simulation designs, BOM cost optimization, and project scheduling. Developed automated test programs in collaboration with instrument vendors to reduce test cycle times. Experienced in ESD, EMI regulatory testing, and FCC/ETSI certifications. Trained junior engineers in impedance matching and ADS/HFSS EM simulations.

負責 WiMAX 終端設備與基站模組設計與模擬。撰寫 RFQ 設計提案、優化 BOM 成本及時程規劃。開發自動化測試程式縮短測試時間,熟稔 ESD、EMI、FCC/ETSI 認證流程與天線模擬。

Education & Certifications

Academic foundation and continuous professional training in electrical engineering, RF systems, and advanced technology domains.

May 2026

No Code AI & Machine Learning

Massachusetts Institute of Technology (MIT), USA

Professional certification in data science solutions and machine learning implementations. (數據科學與機器學習專業證書)

View Credential (檢視證書)
Dec 2003 - Jun 2005

M.S. in Electrical Engineering

National Central University (國立中央大學)

Specialized in Wireless Transceiver Front-end Circuits and passive RF devices. (研發無線收發前端電路與微波被動元件)

Thesis: The Study on Wireless Transceiver Front-end Circuits and Related Passive Devices (指導教授:邱煥凱)

Sept 2000 - Jun 2003

B.S. in Electrical Engineering

Fu Jen Catholic University (輔仁大學)

Core grounding in circuit analysis, electromagnetics, microwave engineering, and semiconductor physics. (電機工程學士學位)

Jun 2009

Foxconn Six-Sigma Green-Belt

Foxconn (富士康科技集團)

Training course for Green-belt Six-sigma. Received Project Contest "Excellent" award. (六標準差綠帶認證,榮獲專案競賽優等獎)

Nov 2007

Dale Carnegie Training

Dale Carnegie & Associates, Inc.

Training course on Public Speaking: "How to speak to the public". Received Achievement Award. (卡內基公眾表達與演說訓練,榮獲最高榮譽獎)

Patents & Academic Publications

在天線設計、無線網路及電路架構領域累積了豐富研發成果,並擁有多項國際專利與學術期刊發表。

依地區篩選:

代表性學術論文

"High Performance Spiral Inductor on Deep-Trench-Mesh Silicon Substrate"
Hsin-Lung Tu, I.-Shan Chen, Ping-Chun Yeh, and Hwann-Kaeo Chiou. IEEE Microwave and Wireless Components Letters (MWCL), Vol. 16, No. 12, Dec. 2006, pp. 654-656.
"A 30 GHz 10 dB Low Noise Amplifier Using Standard 0.18-μm CMOS Technology"
Hsin-Lung Tu, Tsung-Yu Yang, Kung-Hao Liang, and Hwann-Kaeo Chiou. Microwave and Optical Technology Letters (MOTL), Vol. 49, No. 3, Mar. 2007, pp. 647-649.
"Low-voltage High-linear and Isolation Transformer Based Mixer for Direct Conversion Receiver"
Tsung-Yu Yang, Hsin-Lung Tu, and Hwann-Kaeo Chiou. Proceedings of 2006 IEEE International Symposium on Circuits and Systems (ISCAS), Kos Island, Greece, May 2006, pp. 3754-3757.
"Low phase noise VCO design with Symmetrical Inductor in CMOS 0.35-μm Technology"
Hsin-lung Tu, Tsung-Yu Yang, and Hwann-Kaeo Chiou. IEEE Asia Pacific Microwave Conference (APMC), Suzhou, China, 2005.
"A windows-based dual-channel arbitrary signal generator"
Ying-Wen Bai, Hong-Gi Wei, Chung-Yueh Lien, and Hsin-Lung Tu. Proceedings of the 19th IEEE Instrumentation and Measurement Technology Conference (IMTC), Vol. 2, May 2002, pp. 1425-1430.
"The Study on Wireless Transceiver Front-end Circuits and Related Passive Devices"
Hsin-Lung Tu, Master's Thesis, National Central University (國立中央大學), Taoyuan, Taiwan, 2005. (Advisor: Hwann-Kaeo Chiou / 邱煥凱)

台語文學與母語創作

筆名「澹露水/凍露水」、「pháiⁿ-gín-á Oan-lí-siā」,長年耕耘台語現代詩、散文與小說,致力推廣母語書寫與閱讀,深信「說寫母語是人生最大的投資」。

出版著作 (已出版 9 本書)

涵蓋兒童繪本、台語長篇小說與台語現代詩集,將對這片土地的歷史關懷與生活寫照化為溫柔而鋒利的台文字句。

受邀至各書局、文學館及大專院校,分享台語創作經驗與推廣母語學習。

講座主題 / 主辦單位 日期

透過講座、廣播節目與音樂創作,讓台語不只是說出口,更能成為文學、思想與音樂的載體。

金曲獲獎作品合作詞人

2016 廖士賢 -【有魂無體】作詞:杜信龍。本作品以極具哲學感與畫面張力的台語詞作,與金曲獎常客廖士賢老師跨界聯手,描繪社會底層與靈魂的深層對話,將母語之美推向主流音樂殿堂。

線上聆聽歌曲

極限超馬越野與登山足跡

雙腳是我的畫筆,大地是我的畫布。累計已完成了 85 場長距離馬拉松,包含 11 場超馬與險峻的百公里高難度越野挑戰,從路跑的節律中淬煉出人生的專注與毅力。

85 已完賽場次
11 超極馬拉松 / 越野挑戰
21 半程馬拉松
4,100m+ 越野最大單場爬升
35 座已登頂百岳
(2010 - 2016)
「跑步與寫作很像,都需要長期的自律與專注。當你跑在旭海的暴雨中,或是獨自在 308 高地翻越泥濘山路時,你沒有雜念,只有眼前的每一步,和自己的呼吸。這和在實驗室抓晶片 outliers 或是在深夜構思一個台語小說的字句,有著如出一轍的靈魂共鳴。」
2025 XTRAIL 越野跑 烏白

指標性越野與極限賽事記錄

  • 2026 XTRAIL 100K 越野跑挑戰賽:實際完賽 94 公里,錶測累計爬升達 4000 公尺,耗時 19 小時 29 分。
  • 2025 跑山獸 75K 越野賽:實際完賽約 80 公里,累計爬升 4100 公尺,耗時 16 小時 36 分。
  • 2025 - Xtrail 100 越野跑挑戰賽 (93k):累計爬升 2715 公尺,耗時 21 小時 17 分。
  • 2015 新竹鎮西堡超級馬拉松 (100K):人生首場百公里公路超馬完賽,耗時 12 小時 58 分。
  • 2024 旭海超級馬拉松 70K:跨越車城海岸線,夜間 1:00 起跑,爬升 837 公尺,耗時 9 小時 39 分。

台灣百岳足跡地圖 (2010 - 2016)

在投入越野跑與超馬之前,我自 2010 年至 2016 年間深入台灣高山,完成了 35 座台灣百岳的攀登與帶團足跡。下方地圖記錄了這些年來的山行歲月:

台灣跑步足跡地圖 ( 2024-0227~now)

記錄自 2024 年 2 月至今的所有公路路跑、馬拉松、越野超馬與戶外訓練足跡(已自動排除室內自行車與跑步機)。支援即時互動縮放、搜尋、多圖層切換與隨時匯入新 GPX 檔案:

85 場馬拉松賽事全紀錄

歡迎使用下方搜尋與過濾器,查詢我自 2012 年起走過的所有馬拉松與越野跑足跡。

編號 賽事名稱 舉辦日期 完賽時間 類型

社會責任與多維認證

熱血捐血 100+ 次

堅信社會回饋重於一切,已累計完成超過 100 次的無償捐血,以實際行動展現對生命的長期守護與社會責任。

國防役新竹關西受訓

2005.10 ~ 2006.01:接受為期 3 個月的國防役新竹關西入伍受訓與軍事訓練。

救難訓練與紅十字會

2009.12 ~ 2012.12:開始參與專業防救災救難訓練,並加入紅十字會救難服務。

EMT-Basic 救護技術員

2010.1 取得內政部認證之緊急救護技術員 (EMT-1) 證照,具備院前創傷救護、緊急心肺復甦術與創傷止血基礎技能。

陸域防救災救助訓練

於 2010 年 9 月完成內政部消防署「民間災害防救團體—陸域救助類」專業培訓,具備陸域搜救與防救災實務技能。

山域搜救訓練認證

2011 年 9 月完成山域搜救類訓練課程共 50 小時,訓練科目涵蓋地圖判讀、固定點架設、攀岩、繩索登降、簡易擔架製作、野外求生、溯溪及筆試測驗。

金六結教育召集

2012.03.30 ~ 2012.04.03:教召佇金六結營區,接受國軍教育召集訓練。

急流救生安全訓練

於 2012 年 5 月於花蓮完成急流救生訓練。受訓包含攻擊與防禦式上岸、水流分辨、拋繩袋救助、洄流區應用、反舟自救、各式漂流(個人/團漂/夜漂),以及橫渡(個人/多人/繩索)與物資運送測試。

2014 高雄氣爆事故救災

2014 年高雄石化管線氣爆事故發生後,即投入現場救災行動,協助災區搜救與緊急應變,展現面對重大突發災難的實戰應變能力。

2016 台南地震維冠金龍大樓救災

2016 年台南大地震後,參與永康區維冠金龍大樓倒塌現場救災工作,於廢墟中協助搜救受困人員,深刻體現公民救援與人道關懷的核心價值。

基進讀冊會召集與導讀

2022.10 - 2025.06:開辦基進讀冊會,凝聚渴望自我成長的夥伴共同學習,藉由書籍與思想交流尋求突破人生困境的核心力量。

極光 IDPA 新進射手訓練

2024.02.18:完成極光訓練之 IDPA 新進射手訓練課程,掌握基礎防衛射擊與安全觀念。

極光 CP 戰鬥手槍訓練

2024.10.26:完成極光訓練之 CP (Combat Pistol) 戰鬥手槍射擊訓練課程,精進戰術防衛射擊技巧。

與我鏈結

不論您是半導體工程師、資料科學家、台語文學同好、馬拉松跑者,或是對我出版的著作感興趣,都非常歡迎與我聯繫,共同探討跨界合作的無限可能。

電子信箱

masahltu0322@gmail.com

聯絡電話

+886 929-661278

主要活動地點

台灣 台南市 (Tainan, Taiwan)